Guangzhou, China ISO 9001 · ISO 14001 · ISO 18001 CE / GS tested by TÜV Rheinland
Sales desk Guangzhou · +86 198 6588 7686
All equipment families257 modelsBuying guides13ForkliftDiesel forklift trucks9Electric forklift trucks11LPG and gas forklift trucks7StackerReach stackers10Stackers and order pickers33Pallet truckPallet trucks25Lift table and drum handlingDrum handlers11Lift tables20Vacuum lifterVacuum lifters19Aerial work platformAerial work platforms14Electric tractorElectric tow tractors9ConveyorConveyors9Loading rampDock ramps7Storage systemStorage systems28Other handling equipmentSpecial-purpose handling equipment45 Videos Buying guides Search models Certificates Buyer FAQ About us Contact us Request a quote

Mold change and moving truck

Mold change and moving truck Mold change and moving truck. The machine is specified against the load, floor and working height.

Mold change and moving truck — product photo 1 of 6

Ordering facts for the Mold change and moving truck

Confirmed terms
Minimum order
1 set — mixed models can be combined in one container.
Lead time
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days.
Payment
T/T 30% deposit, 70% balance against copy of the bill of lading.
Loading ports
Guangzhou, Shenzhen or Nansha.
Certification
CE on the product range; the factory holds ISO 9001, ISO 14001 and ISO 18001.
Warranty
12 months from delivery.
Price
Prices are not published on this site — every offer is quoted line by line against the load, lift height, floor condition and destination port.

Specification

Mold change and moving truck specification

The source record did not publish a parameter table for this model. The listed figures below are limited to what the record confirms; request the missing parameters through the enquiry form.

Request price Datasheet (print / save as PDF) Ask about configuration

Gallery

Product photographs

All detail images published for this model.

What this model is built to do

Mold change and moving truck Mold change and moving truck, part of the Special-purpose handling equipment line.

Hand trucks and trolleys, stair-climbing carts, paper-roll and coil clamps, forklift attachments, jacks and other auxiliary tools that do not fit the powered-vehicle families.

General material handling

The machine is specified against the load, floor and working height.

This item belongs to the broader SUNRISE material handling catalogue.

Selection starts from the load per move and the space around it.

The machine is specified against the load, floor and working height.

Check closed mast or chassis height against the lowest door on the route. Confirm the charger voltage or fuel type for your destination country.

Specification walk-through

The published parameters for this build are listed in the specification table.

Items the source record did not publish are shown as an em dash in the table.

Those missing items can be asked for directly through the enquiry form.

An em dash marks a value the source record did not publish.

Those missing values can be requested directly through the enquiry form.

Options and attachments are listed separately from the base chassis.

How to specify the right build

Configuration follows the load, working height and site layout.

Measure the pallet footprint before the chassis is shortlisted.

The enquiry should list any attachment the job requires.

Note any attachment that changes the load centre or the overall width.

Compare capacity first, then the lift height the job actually needs.

Check the machine weight against floor loading where the site is raised.

Check the chassis width against the aisle and the container door.

  • Mark the stations where loads are picked up and dropped off each shift.
  • List the load per move, lift height and floor surface before comparing models.
  • List attachments such as clamps, sideshift or rotator separately.

Site preparation and operating notes

On the Mold change and moving truck, send photographs of the racking and the existing working area when possible.

Mark the stations where loads are picked up and dropped off each shift.

On the Mold change and moving truck, describe the floor surface: sealed concrete, asphalt, gravel or packed earth.

Keep the charging or refuelling position clear of the main traffic aisle.

On the Mold change and moving truck, state the shifts per day so the power arrangement can be sized properly.

Operation and routine checks

On the Mold change and moving truck, attachments are secured before the machine leaves the station.

The operator follows the rated capacity marked on the chassis.

On the Mold change and moving truck, loads are kept low while travelling between stations.

Unusual noise or movement is reported before further use.

How this model fits the operation

On the Mold change and moving truck, the receiving side pairs it with a dock ramp or platform where needed.

Storage cages and racking organise the loads it moves between stations.

On the Mold change and moving truck, related models in the same group are listed on the family page.

This machine usually works alongside pallet trucks and stacking equipment.

Working conditions and honest limits

On the Mold change and moving truck, tyre choice should match the floor rather than the price list.

The specification sheet is the binding reference for listed values.

On the Mold change and moving truck, the signed datasheet issued with the quotation is the binding version.

Site conditions such as gradient, dust and moisture belong in the enquiry.

Delivery, documents and support

On the Mold change and moving truck, quote the serial number and component name when ordering spares.

The operation and parts material travel with the machine.

On the Mold change and moving truck, wear parts are supplied after delivery against the parts manual.

Loading is recorded before the container is sealed.

The serial number identifies the build when parts are ordered later.

The parts manual lists the wear items and their reference views.

The operation material covers controls, checks and routine service points.

Before you order

  • Compare the published capacity against the heaviest single move before the mast or attachment is chosen.
  • Dimensions in the specification come from the source record — check them against the container door, the lowest door on the route and the aisle before ordering.
  • Attachment options are confirmed on the quotation; their weight and width are counted against the residual capacity.
  • CE or GS documentation where applicable is listed in the quotation together with the factory quality certificates.
  • The parts manual ships with the machine; identify wear items by serial number and part name when reordering.

Questions

Questions buyers ask before ordering

Can it enter a container or trailer?+

Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.

Which certifications accompany the machine?+

The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.

What is the lead time?+

Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.

How are spare parts handled after delivery?+

The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.

What information do you need for a quotation?+

Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.

What does the price depend on?+

Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.

What is the minimum order quantity?+

The minimum order quantity is one set, and mixed models can be combined in one container.

How is payment arranged?+

Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.

Which ports can the machine ship from?+

Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.

Related

Other models in this family

Same-family comparison using the published source figures; open a model page for the full specification.

Special-purpose handling equipment related models

ModelCapacityLiftPowerTypical use
WCR-120E/030C———Site-specific lifting and moving tasks
WPR-10———Site-specific lifting and moving tasks
ST02(2ton———Manual pallet jack duty
STFL32X———Lifting and moving pallets
ST880X———Manual pallet jack duty

Explore

Related equipment and buying guides

Send the load and the working conditions

Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.

Tel0086-20-23357922
WhatsApp / WeChat0086-19865887686
OfficeRoom 2102, No.348 Tancun Road, Tianhe District, Guangzhou, China
We reply within 12 working hours.