Guangzhou, China ISO 9001 · ISO 14001 · ISO 18001 CE / GS tested by TÜV Rheinland
Sales desk Guangzhou · +86 198 6588 7686
All equipment families257 modelsBuying guides13ForkliftDiesel forklift trucks9Electric forklift trucks11LPG and gas forklift trucks7StackerReach stackers10Stackers and order pickers33Pallet truckPallet trucks25Lift table and drum handlingDrum handlers11Lift tables20Vacuum lifterVacuum lifters19Aerial work platformAerial work platforms14Electric tractorElectric tow tractors9ConveyorConveyors9Loading rampDock ramps7Storage systemStorage systems28Other handling equipmentSpecial-purpose handling equipment45 Videos Buying guides Search models Certificates Buyer FAQ About us Contact us Request a quote

Heavy duty rack — storage system

Heavy duty rack Racking System. The storage layout sets the aisle width the truck must enter.

Heavy duty rack storage system — product photo 1 of 2

Ordering facts for the Heavy duty rack

Confirmed terms
Minimum order
1 set — mixed models can be combined in one container.
Lead time
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days.
Payment
T/T 30% deposit, 70% balance against copy of the bill of lading.
Loading ports
Guangzhou, Shenzhen or Nansha.
Certification
CE on the product range; the factory holds ISO 9001, ISO 14001 and ISO 18001.
Warranty
12 months from delivery.
Price
Prices are not published on this site — every offer is quoted line by line against the load, lift height, floor condition and destination port.

Specification

Heavy duty rack specification

Values are copied from the source record in their original order and units.

Heavy duty rack specification table
ParameterValue
Rack SizeLength / From 1800mm to 3900mm
DepthFrom 800mm to 1500mm
HeightFrom 1800mm to 12000mm
Upright frame Size65*65mm / 72*90mm /90*120mm thickness:1.5~2.0~2.3~3mm
Beam Size80*40/105*40/125*50mm 150*50/160*50mm thickness: 1.5mm. 2mm optional
Request price Datasheet (print / save as PDF) Ask about configuration

Gallery

Product photographs

All detail images published for this model.

What this model is built to do

Heavy duty rack Racking System, part of the Storage systems line.

Racking, wire mesh containers, pallets and decking for pallet and bulk-goods storage.

Warehouse stocking

The storage layout sets the aisle width the truck must enter.

Beam, shelving and cage layouts follow pallet size and aisle height.

The storage layout sets the aisle width the truck must enter.

Load beams are spaced to the pallet depth and stacking height.

Note cold store, outdoor gradient or container entry as a constraint. Describe the shifts per day when the power arrangement is selected.

Specification walk-through

The specification sheet records Rack Size: Length / From 1800mm to 3900mm; Depth: From 800mm to 1500mm; Height: From 1800mm to 12000mm; Upright frame Size: 65*65mm / 72*90mm /90*120mm thickness:1.5~2.0~2.3~3mm; Beam Size: 80*40/105*40/125*50mm 150*50/160*50mm thickness: 1.5mm. 2mm optional.

Remaining parameters are listed row by row in the specification table.

Units are copied as published; convert them only when comparing models.

An em dash marks a value the source record did not publish.

Rated figures apply at the standard load centre unless a row says otherwise.

Options and attachments are listed separately from the base chassis.

How to specify the right build

Configuration follows the load, working height and site layout.

The enquiry should list any attachment the job requires.

The listed figures follow the record; options are confirmed on the quotation.

Compare the lowered height against the lowest door on the route.

Review the tyre type against the surface the machine will run on.

Check the chassis width against the aisle and the container door.

Compare capacity first, then the lift height the job actually needs.

  • List attachments such as clamps, sideshift or rotator separately.
  • Note any constraint: low door, narrow aisle, cold store, outdoor gradient or entry.
  • List the load per move, lift height and floor surface before comparing models.

Site preparation and operating notes

On the Heavy duty rack, send photographs of the racking and the existing working area when possible.

Mark the stations where loads are picked up and dropped off each shift.

On the Heavy duty rack, check the lowest door, beam height and aisle the truck has to pass through.

List the attachments required, such as clamps, sideshift or rotator.

On the Heavy duty rack, state the shifts per day so the power arrangement can be sized properly.

Operation and routine checks

On the Heavy duty rack, loads are kept low while travelling between stations.

Routine checks cover tyres, brakes, controls and visible leaks.

On the Heavy duty rack, the operator follows the rated capacity marked on the chassis.

The operator checks load stability before each lift or move.

How this model fits the operation

On the Heavy duty rack, related models in the same group are listed on the family page.

This machine usually works alongside pallet trucks and stacking equipment.

On the Heavy duty rack, spare parts for wear items follow the parts manual after delivery.

Attachments such as clamps or rotators are matched to the load shape.

Working conditions and honest limits

On the Heavy duty rack, site conditions such as gradient, dust and moisture belong in the enquiry.

Capacity above the rated lift height follows the mast curve.

On the Heavy duty rack, the specification sheet is the binding reference for listed values.

Dimensions are checked against the source record before quoting.

Delivery, documents and support

On the Heavy duty rack, mixed equipment can be listed on one enquiry.

Wear parts are supplied after delivery against the parts manual.

On the Heavy duty rack, the operation and parts material travel with the machine.

Loading is recorded before the container is sealed.

The serial number identifies the build when parts are ordered later.

The operation material covers controls, checks and routine service points.

The parts manual lists the wear items and their reference views.

Before you order

  • Capacity shown is the rated figure at the stated load centre; above the rated lift height the capacity follows the mast curve.
  • Dimensions in the specification come from the source record — check them against the container door, the lowest door on the route and the aisle before ordering.
  • Attachments are quoted separately once the base chassis is fixed, so the attachment weight can be counted against the residual capacity.
  • CE or GS documentation where applicable is listed in the quotation together with the factory quality certificates.
  • The parts manual ships with the machine; identify wear items by serial number and part name when reordering.

Questions

Questions buyers ask before ordering

Can it enter a container or trailer?+

Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.

Which certifications accompany the machine?+

The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.

What is the lead time?+

Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.

How are spare parts handled after delivery?+

The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.

What information do you need for a quotation?+

Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.

What does the price depend on?+

Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.

What is the minimum order quantity?+

The minimum order quantity is one set, and mixed models can be combined in one container.

How is payment arranged?+

Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.

Which ports can the machine ship from?+

Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.

Related

Other models in this family

Same-family comparison using the published source figures; open a model page for the full specification.

Storage systems related models

ModelCapacityLiftPowerTypical use
wire———Pallet and bulk storage
slotted———Returnable goods storage
SRWL***———Returnable goods storage
Mid———Racking organisation
DM———Pallet and bulk storage

Explore

Related equipment and buying guides

Send the load and the working conditions

Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.

Tel0086-20-23357922
WhatsApp / WeChat0086-19865887686
OfficeRoom 2102, No.348 Tancun Road, Tianhe District, Guangzhou, China
We reply within 12 working hours.