CJ*** Forklift attachment. This item belongs to the broader SUNRISE material handling catalogue.

Specification
Values are copied from the source record in their original order and units.
| Parameter | Value |
|---|---|
| CJ16G-A1 | 1600 @600 / 1-2.5t / 1040 / 400-1625 / 1070 / 740 / 28 / 35 / 100 / 155 / 170 / 167 / 326 |
| CJ16G-A2 | 1600 @600 / 1-2.5t / 1040 / 400-1625 / 1220 / 740 / 28 / 35 / 100 / 161 / 170 / 167 / 295 |
| CJ23G-B1 | 2300 @600 / 3-4.5t / 1010 / 440-1785 / 1070 / 738 / 28 / 45 / 125 / 214 / 163 / 184 / 450 |
| CJ23G-B2 | 2300 @500 / 3-4.5t / 1010 / 410-1780 / 1070 / 796 / 24 / 50 / 150 / 323 / 164 / 318 / 765 |
| CJ23G-B3 | 2300@500 / 3-4.5t / 1010 / 440-1785 / 1520 / 738 / 28 / 45 / 125 / 200 / 218 / 184 / 490 |
| CJ23G-B4 | 2300@500 / 3-4.5t / 1010 / 440-1785 / 1670 / 738 / 28 / 45 / 125 / 180 / 291 / 184 / 490 |
| CJ30G-C1 | 3000@600 / 5-7t / 1010 / 438-2038 / 1670 / 949 / 28 / 50 / 125 / 202 / 241 / 212 / 750 |
| Model | Pressure value (Bar) / Flow value(Bar) |
| Maximum | Lateral movement / Clamping action |
| Least | Recommend / Maximum / Least |
| CJ**G-A | 160 / 4 / 15 / 26 |
| CJ**G-B | 160 / 4 / 23 / 38 / 15 |
Gallery
All detail images published for this model.


CJ*** Forklift attachment, part of the Special-purpose handling equipment line.
Hand trucks and trolleys, stair-climbing carts, paper-roll and coil clamps, forklift attachments, jacks and other auxiliary tools that do not fit the powered-vehicle families.
Site and warehouse work
The machine is specified against the load, floor and working height.
The machine is specified against the load, floor and working height.
The machine is specified against the load, floor and working height.
The machine is specified against the load, floor and working height.
Check closed mast or chassis height against the lowest door on the route. Confirm the aisle width against the pallet depth before choosing a chassis.
The specification sheet records CJ16G-A1: 1600 @600 / 1-2.5t / 1040 / 400-1625 / 1070 / 740 / 28 / 35 / 100 / 155 / 170 / 167 / 326; CJ16G-A2: 1600 @600 / 1-2.5t / 1040 / 400-1625 / 1220 / 740 / 28 / 35 / 100 / 161 / 170 / 167 / 295; CJ23G-B1: 2300 @600 / 3-4.5t / 1010 / 440-1785 / 1070 / 738 / 28 / 45 / 125 / 214 / 163 / 184 / 450; CJ23G-B2: 2300 @500 / 3-4.5t / 1010 / 410-1780 / 1070 / 796 / 24 / 50 / 150 / 323 / 164 / 318 / 765; CJ23G-B3: 2300@500 / 3-4.5t / 1010 / 440-1785 / 1520 / 738 / 28 / 45 / 125 / 200 / 218 / 184 / 490; CJ23G-B4: 2300@500 / 3-4.5t / 1010 / 440-1785 / 1670 / 738 / 28 / 45 / 125 / 180 / 291 / 184 / 490.
The specification sheet records CJ30G-C1: 3000@600 / 5-7t / 1010 / 438-2038 / 1670 / 949 / 28 / 50 / 125 / 202 / 241 / 212 / 750; Model: Pressure value (Bar) / Flow value(Bar); Maximum: Lateral movement / Clamping action; Least: Recommend / Maximum / Least; CJ**G-A: 160 / 4 / 15 / 26; CJ**G-B: 160 / 4 / 23 / 38 / 15.
Each row in the table keeps the label and value from the source record.
Units are copied as published; convert them only when comparing models.
Rated figures apply at the standard load centre unless a row says otherwise.
Options and attachments are listed separately from the base chassis.
Configuration follows the load, working height and site layout.
The enquiry should list any attachment the job requires.
Send pallet size, door height and aisle width with the enquiry.
Compare the lowered height against the lowest door on the route.
Compare capacity first, then the lift height the job actually needs.
Check the machine weight against floor loading where the site is raised.
List the models that clear each constraint before asking for a quote.
On the CJ***, check headroom under beams, pipes and door frames along the route.
Send photographs of the racking and the existing working area when possible.
On the CJ***, keep the charging or refuelling position clear of the main traffic aisle.
Describe the floor surface: sealed concrete, asphalt, gravel or packed earth.
On the CJ***, list the attachments required, such as clamps, sideshift or rotator.
On the CJ***, the working area is kept clear of loose packaging and obstacles.
Unusual noise or movement is reported before further use.
On the CJ***, attachments are secured before the machine leaves the station.
The operator checks load stability before each lift or move.
On the CJ***, this machine usually works alongside pallet trucks and stacking equipment.
Related models in the same group are listed on the family page.
On the CJ***, the layout drawing shows where each machine sits in the operation.
The receiving side pairs it with a dock ramp or platform where needed.
On the CJ***, dimensions are checked against the source record before quoting.
Capacity above the rated lift height follows the mast curve.
On the CJ***, the specification sheet is the binding reference for listed values.
The signed datasheet issued with the quotation is the binding version.
On the CJ***, packing follows sea-freight practice for the chosen chassis.
Wear parts are supplied after delivery against the parts manual.
On the CJ***, mixed equipment can be listed on one enquiry.
The operation and parts material travel with the machine.
Test and conformity documents follow the model and destination market.
The parts manual lists the wear items and their reference views.
The operation material covers controls, checks and routine service points.
Questions
Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.
The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.
The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.
Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.
Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.
The minimum order quantity is one set, and mixed models can be combined in one container.
Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.
Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.
Related
Same-family comparison using the published source figures; open a model page for the full specification.
Special-purpose handling equipment related models
Explore
Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.