Guangzhou, China ISO 9001 · ISO 14001 · ISO 18001 CE / GS tested by TÜV Rheinland
Sales desk Guangzhou · +86 198 6588 7686
All equipment families257 modelsBuying guides13ForkliftDiesel forklift trucks9Electric forklift trucks11LPG and gas forklift trucks7StackerReach stackers10Stackers and order pickers33Pallet truckPallet trucks25Lift table and drum handlingDrum handlers11Lift tables20Vacuum lifterVacuum lifters19Aerial work platformAerial work platforms14Electric tractorElectric tow tractors9ConveyorConveyors9Loading rampDock ramps7Storage systemStorage systems28Other handling equipmentSpecial-purpose handling equipment45 Videos Buying guides Search models Certificates Buyer FAQ About us Contact us Request a quote

Manuel moving, electric vacuum lifter — vacuum lifter

Manuel moving, electric vacuum lifter Vacuum lifter. Glass, stone, metal sheet and plasterboard are handled with pad frames.

Manuel moving, electric vacuum lifter — product photo 1 of 1

Ordering facts for the Manuel moving, electric vacuum lifter

Confirmed terms
Minimum order
1 set — mixed models can be combined in one container.
Lead time
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days.
Payment
T/T 30% deposit, 70% balance against copy of the bill of lading.
Loading ports
Guangzhou, Shenzhen or Nansha.
Certification
CE on the product range; the factory holds ISO 9001, ISO 14001 and ISO 18001.
Warranty
12 months from delivery.
Price
Prices are not published on this site — every offer is quoted line by line against the load, lift height, floor condition and destination port.

Specification

Manuel moving, electric vacuum lifter specification

The source record did not publish a parameter table for this model. The listed figures below are limited to what the record confirms; request the missing parameters through the enquiry form.

Request price Datasheet (print / save as PDF) Ask about configuration

What this model is built to do

Manuel moving, electric vacuum lifter Vacuum lifter, part of the Vacuum lifters line.

Vacuum suction lifters and frames for glass, stone, metal sheet and panel installation.

Suction pad sheet handling

Seal condition is checked before each lift on a smooth surface.

Pads are matched to the sheet surface and the load weight.

Rotation and tilting let one operator place a panel into a rack.

The lifter pairs with a crane, forklift attachment or its own battery frame.

Note cold store, outdoor gradient or container entry as a constraint. Compare rated capacity against the heaviest single load you move.

Specification walk-through

The published parameters for this build are listed in the specification table.

Items the source record did not publish are shown as an em dash in the table.

Those missing items can be asked for directly through the enquiry form.

Those missing values can be requested directly through the enquiry form.

Units are copied as published; convert them only when comparing models.

Options and attachments are listed separately from the base chassis.

How to specify the right build

Configuration follows the load, working height and site layout.

Dimensions in the table come from the source record.

Measure the pallet footprint before the chassis is shortlisted.

Check the machine weight against floor loading where the site is raised.

Review the tyre type against the surface the machine will run on.

Compare the lowered height against the lowest door on the route.

Match the power arrangement to the shifts and the working environment.

  • List attachments such as clamps, sideshift or rotator separately.
  • Note any constraint: low door, narrow aisle, cold store, outdoor gradient or entry.
  • List the load per move, lift height and floor surface before comparing models.

Site preparation and operating notes

On the Manuel moving, electric vacuum lifter, keep the charging or refuelling position clear of the main traffic aisle.

Check headroom under beams, pipes and door frames along the route.

On the Manuel moving, electric vacuum lifter, check the lowest door, beam height and aisle the truck has to pass through.

Note any slope, threshold or step along the working route.

On the Manuel moving, electric vacuum lifter, measure the pallet footprint and the heaviest single load before comparing models.

Operation and routine checks

On the Manuel moving, electric vacuum lifter, the operator checks load stability before each lift or move.

Attachments are secured before the machine leaves the station.

On the Manuel moving, electric vacuum lifter, the working area is kept clear of loose packaging and obstacles.

Battery or fuel levels are checked at the start of each shift.

How this model fits the operation

On the Manuel moving, electric vacuum lifter, a mixed enquiry can list this model together with other families.

Storage cages and racking organise the loads it moves between stations.

On the Manuel moving, electric vacuum lifter, the receiving side pairs it with a dock ramp or platform where needed.

Related models in the same group are listed on the family page.

Working conditions and honest limits

On the Manuel moving, electric vacuum lifter, any option not listed should be confirmed in writing before order.

Dimensions are checked against the source record before quoting.

On the Manuel moving, electric vacuum lifter, the specification sheet is the binding reference for listed values.

The signed datasheet issued with the quotation is the binding version.

Delivery, documents and support

On the Manuel moving, electric vacuum lifter, loading is recorded before the container is sealed.

Quotations follow the model, listed specification and destination port.

On the Manuel moving, electric vacuum lifter, the enquiry should include the quantity and destination port.

The operation and parts material travel with the machine.

The serial number identifies the build when parts are ordered later.

Test and conformity documents follow the model and destination market.

The operation material covers controls, checks and routine service points.

Before you order

  • The rated load applies at the standard load centre; carrying the load farther forward reduces the figure marked on the chassis plate.
  • Check overall width and turning space against the aisle and any narrow doorway before the chassis is shortlisted.
  • Attachment options are confirmed on the quotation; their weight and width are counted against the residual capacity.
  • The certificate set for an order follows the destination market; ISO factory certificates and the serial list ship with the consignment.
  • Wear parts are ordered after delivery against the parts manual, the serial number and the component name.

Questions

Questions buyers ask before ordering

Can it enter a container or trailer?+

Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.

Which certifications accompany the machine?+

The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.

What is the lead time?+

Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.

How are spare parts handled after delivery?+

The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.

What information do you need for a quotation?+

Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.

What does the price depend on?+

Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.

What is the minimum order quantity?+

The minimum order quantity is one set, and mixed models can be combined in one container.

How is payment arranged?+

Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.

Which ports can the machine ship from?+

Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.

Related

Other models in this family

Same-family comparison using the published source figures; open a model page for the full specification.

Vacuum lifters related models

ModelCapacityLiftPowerTypical use
WS-GR———Board and panel placement
WCR-GR———Panel feeding to machines
DOOR———Stone and panel handling
Aluminum mast vacuum lifter———Metal sheet lifting
Counterbalance tpye vacuum lifter———Panel feeding to machines

Explore

Related equipment and buying guides

Send the load and the working conditions

Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.

Tel0086-20-23357922
WhatsApp / WeChat0086-19865887686
OfficeRoom 2102, No.348 Tancun Road, Tianhe District, Guangzhou, China
We reply within 12 working hours.