Guangzhou, China ISO 9001 · ISO 14001 · ISO 18001 CE / GS tested by TÜV Rheinland
Sales desk Guangzhou · +86 198 6588 7686
All equipment familiesBuying guidesForkliftDiesel forklift trucksElectric forklift trucksLPG and gas forklift trucksForklift attachmentsTelehandlersStackerReach stackersStackers and order pickersPallet truckPallet trucksHand pallet trucksElectric pallet trucksLift table and drum handlingDrum handlersLift tablesElectric table trucksVacuum lifterVacuum liftersGlass lifter trolleysGlazing robotsAerial work platformAerial work platformsElectric tractorElectric tow tractorsElectric carts & dumpersConveyorConveyorsLoading rampDock rampsStorage systemStorage systemsPallets & containersCrane and liftingCranes & car moversOther handling equipmentSpecial-purpose handling equipment Videos Buying guides Search models Certificates Buyer FAQ About us Contact us Request a quote

PM — pallet

PM Plastic Pallet. Access floor space and column lines are checked against the design.

PM plastic pallet — product photo 1 of 4Click to enlarge

Ordering facts for the PM

Confirmed terms
Minimum order
1 set — mixed models can be combined in one container.
Lead time
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days.
Payment
T/T 30% deposit, 70% balance against copy of the bill of lading.
Loading ports
Guangzhou, Shenzhen or Nansha.
Certification
CE on the product range; the factory holds ISO 9001, ISO 14001 and ISO 18001.
Warranty
12 months from delivery.
Price
Prices are not published on this site — every offer is quoted line by line against the load, lift height, floor condition and destination port.

Specification

PM specification

Table columns, merged cells and units follow the original source record for this model family.

PM specification table
ModelSize(mm)static load (kg)dynamic load(kg)
LWH
PM1210-A1200100014030001000
PM1210-A1120010007804000
PM1111-X1100110014030001000
PM1208-X12008001402000800
ModelSize(mm)static load (kg)dynamic load(kg)
LWH
PM1414-Z1400140014040001000
PM1413-Z1400130014040001000
PM1412-Z1400120014040001000
PM1311-Z1300110014040001000
PM1210-Z1200100014040001000
PM1109-Z110090014040001000
XKB1207-S12007501402000700
XKB1005-S10005001302000500
Request price Datasheet (print / save as PDF) Ask about configuration

What this model is built to do

PM Plastic Pallet, part of the Pallets & containers line.

Plastic and steel pallets in standard and special footprints for racking, export and hygiene-sensitive storage.

Racking organisation

Access floor space and column lines are checked against the design.

Systems are drawn to building dimensions before any truck is ordered.

Racking and systems organise pallet and carton positions inside a warehouse.

Compare rated capacity against the heaviest single load you move. Describe the shifts per day when the power arrangement is selected.

Specification walk-through

The specification sheet records L: W / H; PM1210-A: 1200 / 1000 / 140 / 3000; PM1210-A 1: 1200 / 1000 / 780 / 4000; PM1111-X: 1100 / 140 / 3000 / 1000; PM1208-X: 1200 / 800 / 140 / 2000; L: W / H.

The specification sheet records PM1414-Z: 1400 / 140 / 4000 / 1000; PM1413-Z: 1400 / 1300 / 140 / 4000 / 1000; PM1412-Z: 1400 / 1200 / 140 / 4000 / 1000; PM1311-Z: 1300 / 1100 / 140 / 4000 / 1000; PM1210-Z: 1200 / 1000 / 140 / 4000; PM1109-Z: 1100 / 900 / 140 / 4000 / 1000.

The specification sheet records XKB1207-S: 1200 / 750 / 140 / 2000 / 700; XKB1005-S: 1000 / 500 / 130 / 2000.

Those missing values can be requested directly through the enquiry form.

Units are copied as published; convert them only when comparing models.

Options and attachments are listed separately from the base chassis.

Each row in the table keeps the label and value from the source record.

How to specify the right build

Configuration follows the load, working height and site layout.

Door and beam heights decide which mast will clear the route.

Measure the pallet footprint before the chassis is shortlisted.

List the models that clear each constraint before asking for a quote.

Review the tyre type against the surface the machine will run on.

Note any attachment that changes the load centre or the overall width.

Check the chassis width against the aisle and the container door.

  • List the load per move, lift height and floor surface before comparing models.
  • State the shifts per day so the power arrangement can be sized properly.
  • List attachments such as clamps, sideshift or rotator separately.

Site preparation and operating notes

On the PM, measure the pallet footprint and the heaviest single load before comparing models.

List the attachments required, such as clamps, sideshift or rotator.

On the PM, send photographs of the racking and the existing working area when possible.

Mark the stations where loads are picked up and dropped off each shift.

On the PM, keep the charging or refuelling position clear of the main traffic aisle.

Operation and routine checks

On the PM, the working area is kept clear of loose packaging and obstacles.

Attachments are secured before the machine leaves the station.

On the PM, routine checks cover tyres, brakes, controls and visible leaks.

The operator checks load stability before each lift or move.

How this model fits the operation

On the PM, attachments such as clamps or rotators are matched to the load shape.

Related models in the same group are listed on the family page.

On the PM, spare parts for wear items follow the parts manual after delivery.

The receiving side pairs it with a dock ramp or platform where needed.

Working conditions and honest limits

On the PM, any option not listed should be confirmed in writing before order.

The specification sheet is the binding reference for listed values.

On the PM, capacity above the rated lift height follows the mast curve.

Attachments are quoted separately once the base chassis is fixed.

Delivery, documents and support

On the PM, loading is recorded before the container is sealed.

Wear parts are supplied after delivery against the parts manual.

On the PM, quotations follow the model, listed specification and destination port.

Packing follows sea-freight practice for the chosen chassis.

The parts manual lists the wear items and their reference views.

Test and conformity documents follow the model and destination market.

The operation material covers controls, checks and routine service points.

Before you order

  • The rated load applies at the standard load centre; carrying the load farther forward reduces the figure marked on the chassis plate.
  • Dimensions in the specification come from the source record — check them against the container door, the lowest door on the route and the aisle before ordering.
  • Any clamp, sideshift or rotator changes the load centre and must be listed alongside the base model.
  • Documents issued with the order: ISO 9001, ISO 14001 and ISO 18001 factory certificates, plus CE or GS where the model carries it, and the serial list for the shipment.
  • Spare parts follow the parts manual supplied with the machine; quote the serial number and component name when ordering wear parts.

How PM sits in the Pallets & containers range

The source record for PM publishes 14 parameters, among them L, PM1210-A, PM1210-A 1, PM1111-X; that is the sheet to check against the pallets & containers duty before ordering.

Figures above are copied from the published specification of each model; where a model does not publish a value it is left out of the comparison rather than estimated.

Questions

Questions buyers ask before ordering

Can it enter a container or trailer?+

Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.

Which certifications accompany the machine?+

The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.

What is the lead time?+

Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.

How are spare parts handled after delivery?+

The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.

What information do you need for a quotation?+

Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.

What does the price depend on?+

Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.

What is the minimum order quantity?+

The minimum order quantity is one set, and mixed models can be combined in one container.

How is payment arranged?+

Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.

Which ports can the machine ship from?+

Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.

Related

Other models in this family

Same-family comparison using the published source figures; open a model page for the full specification.

Pallets & containers related models

ModelCapacityLiftPowerTypical use
DM———Pallet and bulk storage
TZ———Carton shelving storage
CZ———Racking organisation
Steel pallet———Bulk-goods positions

Explore

Related equipment and buying guides

Send the load and the working conditions

Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.

Tel0086-20-23357922
WhatsApp / WeChat0086-19865887686
OfficeRoom 2102, No.348 Tancun Road, Tianhe District, Guangzhou, China
We reply within 12 working hours.