DOCK-YARD Dock ramp Tail Lift. Ground conditions at the ramp end decide the leg placement.

Specification
The source record did not publish a parameter table for this model. The listed figures below are limited to what the record confirms; request the missing parameters through the enquiry form.
Gallery
All detail images published for this model.




DOCK-YARD Dock ramp Tail Lift, part of the Dock ramps line.
Mobile yard ramps and container ramps that bridge ground and trailer bed without a fixed dock.
Seasonal dock access
Trucks and pallet trucks drive up the ramp to load or unload.
Mobile ramps suit rented space or seasonal loading points.
A dock ramp bridges the gap between a truck bed and the warehouse floor.
The deck and legs carry the truck and load between ground and trailer.
Note cold store, outdoor gradient or container entry as a constraint. Confirm the aisle width against the pallet depth before choosing a chassis.
The published parameters for this build are listed in the specification table.
Items the source record did not publish are shown as an em dash in the table.
Those missing items can be asked for directly through the enquiry form.
An em dash marks a value the source record did not publish.
Units are copied as published; convert them only when comparing models.
Each row in the table keeps the label and value from the source record.
Configuration follows the load, working height and site layout.
Dimensions in the table come from the source record.
Measure the pallet footprint before the chassis is shortlisted.
Note any attachment that changes the load centre or the overall width.
Compare the lowered height against the lowest door on the route.
List the models that clear each constraint before asking for a quote.
Match the power arrangement to the shifts and the working environment.
On the DOCK-YARD, note any slope, threshold or step along the working route.
Check headroom under beams, pipes and door frames along the route.
On the DOCK-YARD, mark the stations where loads are picked up and dropped off each shift.
State the shifts per day so the power arrangement can be sized properly.
On the DOCK-YARD, keep the charging or refuelling position clear of the main traffic aisle.
On the DOCK-YARD, battery or fuel levels are checked at the start of each shift.
Unusual noise or movement is reported before further use.
On the DOCK-YARD, the operator follows the rated capacity marked on the chassis.
Loads are kept low while travelling between stations.
On the DOCK-YARD, this machine usually works alongside pallet trucks and stacking equipment.
Storage cages and racking organise the loads it moves between stations.
On the DOCK-YARD, a mixed enquiry can list this model together with other families.
Related models in the same group are listed on the family page.
On the DOCK-YARD, any option not listed should be confirmed in writing before order.
Site conditions such as gradient, dust and moisture belong in the enquiry.
On the DOCK-YARD, attachments are quoted separately once the base chassis is fixed.
The signed datasheet issued with the quotation is the binding version.
On the DOCK-YARD, the operation and parts material travel with the machine.
Wear parts are supplied after delivery against the parts manual.
On the DOCK-YARD, the booking reference is issued with the proforma invoice.
Quote the serial number and component name when ordering spares.
Ask for the specific certificate required for your target country.
Test and conformity documents follow the model and destination market.
The operation material covers controls, checks and routine service points.
Questions
Container entry depends on lowered width, mast height and guard clearance. Compare these with the container door.
The product range is CE marked and the factory holds ISO 9001, ISO 14001 and ISO 18001. The documents issued for a specific order are listed in the quotation.
Many forklift, pallet truck, stacker and reach truck models are held in ready stock; customised units are built in about 25 days. The confirmed date for your order is stated on the proforma invoice.
The machine ships with a parts manual. Wear parts can be ordered after delivery against serial number and part name.
Send load per move, lift height, floor surface, quantity and destination port. The reply lists the matching specification.
Prices are not published. Price follows chassis, mast or lift option, power arrangement, tyres and destination port; send the specification and you receive a line-by-line offer.
The minimum order quantity is one set, and mixed models can be combined in one container.
Standard terms are T/T 30% deposit with 70% balance against copy of the bill of lading.
Shipment can be arranged from Guangzhou, Shenzhen or Nansha, whichever suits the sailing and the inland routing.
Related
Same-family comparison using the published source figures; open a model page for the full specification.
Explore
Send the load per move, the lift height and the floor surface. The sales desk matches the chassis to those figures and replies with a line-by-line offer.